Sunday, April 3, 2011
MEATCHUNK PLAZA© CONSTRUCTION UPDATE_04/03/11
Upstairs bathroom gets floor repaired.
Note classy drop ceiling panels reused as insulation.
The floor repaired and ready for concrete board and tile.
The wall is repaired and the bat guano contained.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment