Tuesday, March 22, 2011

MEATCHUNK PLAZA© CONSTRUCTION UPDATE_03/18/11

Downstairs bathroom dismantled. Let the rebuilding begin.

POWERTROOPER© EXCITEMENT_03/17/11

Second load ready for dump.
Thank goodness for O.S.B. Technology!

First load taken to dump...over 1700 pounds!

This load will require more OSB Technology©.

E.C.E.D.C.© metal taken to scrap yard.

MEATCHUNK PLAZA© CONSTRUCTION UPDATE_03/16/11

Old School Wood Ceiling (O.S.W.C.)© revealed.
Refinish or cover with tin?

Much better already.

MEATCHUNK PLAZA© CONSTRUCTION UPDATE_03/15/11

Why is this ceiling 7 feet off the floor?

Energy Crisis Era Drop Ceiling (E.C.E.D.C.)© must go!

STORMTROOPER© ARMOR_03/14/11


The STORMTROOPER's© bed is now lined with military grade armor.
 This protection was hand applied by the professional technicians at Meatchunk Enterprises©.