Tuesday, March 22, 2011
MEATCHUNK PLAZA© CONSTRUCTION UPDATE_03/18/11
Downstairs bathroom dismantled. Let the rebuilding begin.
POWERTROOPER© EXCITEMENT_03/17/11
Second load ready for dump.
Thank goodness for O.S.B. Technology!
First load taken to dump...over 1700 pounds!
This load will require more OSB Technology©.
E.C.E.D.C.© metal taken to scrap yard.
MEATCHUNK PLAZA© CONSTRUCTION UPDATE_03/16/11
Old School Wood Ceiling (O.S.W.C.)© revealed.
Refinish or cover with tin?
Much better already.
MEATCHUNK PLAZA© CONSTRUCTION UPDATE_03/15/11
Why is this ceiling 7 feet off the floor?
Energy Crisis Era Drop Ceiling (E.C.E.D.C.)© must go!
STORMTROOPER© ARMOR_03/14/11
The STORMTROOPER's© bed is now lined with military grade armor.
This protection was hand applied by the professional technicians at Meatchunk Enterprises©.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)