Saturday, September 17, 2011
MOBILE JAM UNIT FIVE© DELIVERY_09/15/11
Not so MOBILE! Thanks to the Smith's (Kent and Paul) for help loading this beast!
All set up for class use!
Locked down, ready for next class.
Monday, September 5, 2011
MEATCHUNK PLAZA© CONSTRUCTION UPDATE_09/04/11
Studio area.
Future Dry Erase Wall with lightbox panels.
Wood shop area.
The wonders of OSB Technology©!
Future light box above.
Perfect studio space.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)