Sunday, April 3, 2011

MEATCHUNK PLAZA© CONSTRUCTION UPDATE_04/03/11

Kitchen cabinets removed.
Tons of bat guano.  Two freaked out bats.

MOBILE CARGO UNIT© ADDITIONS_04/03/11

Custom "Dreadknok" logo by Jake Lord installed near rear of trailer.
Note awesome new tires on trailer.

Two part menacing vinyl graphics.
Too bad I screwed up the installation of the other decal on other side.
 Maybe Jake will make me a new one.

MORE POWERTROOPER© EXCITEMENT_04/03/11

This much POWERTROOPIN'© EXCITEMENT is probably illegal.
Hopefully I won't get a flat at the dump again!

MEATCHUNK PLAZA© CONSTRUCTION UPDATE_04/03/11

Top layer removed; termite and water damage revealed...

This has to be the worst wall ever constructed.
Sarah showed no mercy, as the large pile of debris suggests.

Debris removed.

MEATCHUNK PLAZA© CONSTRUCTION UPDATE_04/03/11

Upstairs bathroom gets floor repaired.
Note classy drop ceiling panels reused as insulation.

The floor repaired and ready for concrete board and tile.

The wall is repaired and the bat guano contained.