Sunday, April 3, 2011

MEATCHUNK PLAZA© CONSTRUCTION UPDATE_04/03/11

Upstairs bathroom gets floor repaired.
Note classy drop ceiling panels reused as insulation.

The floor repaired and ready for concrete board and tile.

The wall is repaired and the bat guano contained.

No comments:

Post a Comment